Time and Work Questions PDF: Download With Answers For Bank Exams

Dear Aspirants, Our IBPS Guide team is providing new series of Quants Questions for IBPS PO Prelims 2023 so the aspirants can practice it on a daily basis. These questions are framed by our skilled experts after understanding your needs thoroughly. Aspirants can practice these new series questions daily to familiarize with the exact exam pattern and make your preparation effective.

 

Time and Work Questions PDF: The time and work questions pdf for bank exams is available here. In the quantitative aptitude section, candidates will skip most of the application sums in exams. Time and Work is one of the topics in the application sums. In the bank prelims and mains exams, you should not take much time for a single question. For that, heavy practice is needed. If you practice well with this time and work questions pdf, you can easily solve the question in around a minute. So, practice more using the Time and Work questions pdf for bank exams. Here we have provided more Time and Work questions on various models. Hence, you can learn a lot of tricks to solve the problem.

In the Time and Work problems, there are various types such as a dishonest seller, a mixture of qualities, etc. In this Time and Work questions pdf for bank exams, you can practice all these types of questions.

 

Banking & Insurance Exam Study Materials

 

Download Time and Work Questions PDF For Bank Exams

Time and Work Questions PDF For Bank Exams: The Time and Work Questions pdf for bank exams download link is provided below on this page. Candidates can improve their efficiency in solving any type of Time and Work questions by using this Time and Work aptitude questions pdf for bank exams. This Time and Work Questions pdf will help you to solve different types and levels of Time and Work questions with speed and accuracy. So download this Time and Work pdf for bank exams for your effective preparation.

 

Download Time and Work Questions PDF

 

Also, we will update the Time and Work questions pdf and Time and Work quiz daily in the below table. Candidates can download this Time and Work questions pdf to practice regularly. You can attempt the daily Time and Work quiz by clicking the take test link provided in the following table.

 

Time and Work Questions For Bank Exams – Daily Quiiz
Day 1 Time and Work Questions PDF Take Test 
Day 2 Time and Work Questions PDF Take Test 

Time and Work Questions And Answers

Time and Work Questions With Solutions: The Time and Work PDF contains all the levels and types of Time and Work questions with answers and detailed explanations. Utilize this Time and Work questions and answers pdf for the bank Prelims exam and Time and Work questions and answers pdf for bank mains to improve your speed and accuracy while solving the Time and Work questions in real exams. You may experience all the techniques and tricks to solve the questions while practicing with the Time and Work questions and answers pdf for bank exams. Aspirants who have quant as their weaker section must take up this PDF for bank exams and practice with this regularly. Candidates can start their effective preparation by exploiting this Time and Work questions pdf for bank exams.

 

Start Quiz

 

1) A can do a piece of work in 25 days, B can do it in 20 days. They started the work together but A left 5 days before the completion of the work. The work has finished in?

A.13 1/3 days

B.15 3/7 days

C.11 4/9 days

D.9 3/8 days

E.None of these


2) 8 girls and 12 boys can complete a work in 4 days. If one boy alone completes the work in 60 days, then in how many days a girl will be able to finish the same work alone?

A.150

B.140

C.160

D.144

E.156


3) A and B together can complete the work in 36 days, B and C together can complete the work in 45 days and A, B and C together can complete the work in 24 days. In how many days A and C together can complete the work?

A.30 days

B.20 days

C.24 days

D.48 days

E.None of these


4) A alone completes the work in 80 days, B alone complete the work in 64 days and C alone complete the work in 160 days. If A, B and C together can started the work, after20 days A left the work and B left the work 15 days before completion of the work, in how many days the work is completed?

A.36 days

B.45 days

C.27 days

D.48 days

E.32 days


5) A, B and C can complete the work in 32 days, 24 days and 30 days respectively. If they started the work together, B left 12 days before completion of the work and C left 6 days before completion of the work and A finished the work. In how many days is the work completed?

A.12

B.14

C.16

D.18

E.20


6) Raj alone completes a piece of work in 10 days. Vel and Yuktha together complete the same in 8 days. If Yuktha and Raj together do the same work in 5 days, then in how many days will Vel alone do the work?

A.15 days

B.20 days

C.25 days

D.30 days

E.40 days


7) A alone completes the work in 15 days and B alone completes the work in 30 days. If A started the work and after 6 days B joined, in how many days the total work completed?

A.10 days

B.8 days

C.12 days

D.15 days

E.18 days


8) 50 men can do a piece of work in 40days. They start the work after some days 10 men left the work. The remaining work will be completed in 40 days. Find after how many days, 10 men left from the work?

A.6 days

B.7 days

C.8 days

D.9 days

E.10 days


9)  A and B can complete the work in 24 days and 16 days respectively. They started the work together and after 6 days B left the work. In how many days A alone complete the remaining work?

A.6 days

B.7 days

C.8 days

D.9 days

E.None of these


10) A completes one-third of the work in 20 days and B completes half of the work in 15 days. In how many days required to A and B together can complete the work?

A.10 days

B.15 days

C.18 days

D.20 days

E.None of these

 

Try Time and Work Questions For Online Mock Test

 

 

Answers :

1) Answer: A

(x – 5)/25 + x/20 = 1

(4x – 20 + 5x)/100 = 1

9x – 20 = 100

9x = 120

x = 120/9 = 13 3/9 = 13 1/3 days


2) Answer: C

Work done by 1 boy in 1 day = 1/60

Work done by 12 boys in 1 day = 12/60 = 1/5

Work done by 12 boys in 4 days = 4/5

In 4 days they will complete 4/5 of work, so 8 girls will finish 1/5 of work in 4 days.

So 1 girl will finish 1/40 of work in 4 days

Therefore, a girl alone will finish the work in 160 days.


3) Answer: A

LCM of (36, 45, 24) =360

A and B complete = 360 / 36 = 10 units

B and C complete = 360 / 45 = 8 units

A, B and C complete = 360/24 = 15 units

A = 15 – 8 = 7 units

B = 10 – 7 units = 3 units

C = 8 – 3 = 5 units

A and C = 7 + 5 =12 units

A and C together can complete the work = 360 / 12 = 30 days


4) Answer: B

20/80 + (x – 15)/64 + x/160 = 1

80 + 5x – 75 + 2x = 320

7x = 315

x = 45 days


5) Answer: C

x/32 + (x – 12)/24 + (x – 6)/30 = 1

15x + 20x – 240 + 16x – 96 = 480

x = 16


6) Answer: E

Days taken by Vel = x days and Days taken by Yuktha = y days

1/x + 1/y = 1/8 – (I)

1/10 + 1/y = 1/5 – (II)

On solving, we get x = 40 days


7) Answer: C

x/15 + (x – 6)/30 = 1

2x + x – 6 = 30

3x = 36

x = 12 days


8) Answer: C

50 men can do a piece of work in 40 days

50men*40=50men*x +40men*40

2000=50x +1600

50x=400

x=8 days


9) Answer: D

A = 1/24

B = 1/16

LCM of (16, 24) = 48

A complete the work in one day = 2 units

B complete the work in one day = 3 units

They work together in 6 days = 6 * (2 + 3) = 30 units of work completed

Remaining work = 48 – 30 = 18 units

A alone complete the remaining = 18/2 = 9 days


10) Answer: D

A completes the full work in = 3/1 * 20 = 60 days

B completes the full work in = 2 * 15 = 30 days

A + B = 1/60 + 1/30 = 3/60

= 1/20

A and B can complete the work in 20 days.

 

Start Quiz

 

11) 18 men and 27 women together can complete a work in 12 days and 24 men and 15 women together can complete the same work in 18 days. In how many days 12 men and 15 women together can complete the work?

A.21 days

B.24 days

C.27 days

D.18 days

E.None of these


12) A alone completes the work in 32 days and A and B together can complete the work in 18 days. If B started the work and after 12 days left the work, in how many days A alone completed the remaining work?

A.26(2/3) days

B.24(2/3) days

C.23(2/3) days

D.21(2/3) days

E.22(2/3) days


13) 20 women can complete the work in 26 days. If 32 boys started the work and after x days, 8 more boys joined the work and completed the remaining work in 7 days. Find the value of x.

A.7.5

B.12.5

C.9

D.15

E.8


14) Bala and Rahul together can do a work in 9 days, whereas Bala alone can do it in 12 days. If Vinay alone can do the same work in 45 days, then find the ratio of the efficiency of Rahul to that of Vinay?

A.7:3

B.4:9

C.5:4

D.8:5

E.None of these


15) A alone can complete a work in 36 days and the ratio of the efficiency of A and B is 7:6. If A and B together started the work and after 12 days A left from the work, in how many days B alone complete the remaining work?

A.12 days

B.14 days

C.15 days

D.16 days

E.20 days


16) A alone completes the work in (x + 8) days and B alone completes the work in (x – 2) days. If A and B together can complete the work in (x – 10) days, find the value of x?

A.10

B.15

C.12

D.18

E.22


17) A can complete the work in 24 days and B and C together can complete the work in 16 days and A and C together can complete the work in 12 days. In how many days B alone completes the work?

A.24 days

B.36 days

C.48 days

D.56 days

E.None of these


18) A alone completes the work in 24 days and B alone completes the work in 40 days. If A and B together started the work and each of them works at 75% of the efficiency, then in how many days A and B together can complete the work?

A.30 days

B.25 days

C.20 days

D.35 days

E.15 days


19) A alone completes the work in x days and B alone completes the work in (x – 10) days. If A and B together can complete the work in 12 days, then find the value of x.

A.28

B.20

C.30

D.25

E.15


20) A, B and C together can complete the work in 6(2/3) days and A alone complete 60% of the work in 9 days. If B alone complete 80% of the work in 16 days, in how many days C alone complete 20% of the work?

A.4 days

B.5 days

C.6 days

D.7 days

E.None of these

 

Try Time and Work Questions For Online Mock Test

 


Answers :

11) Answer: A

(18m + 27w) * 12 = (24m + 15w) * 18

36m + 54w = 72m + 45w

36m = 9w

4m = w

(108 + 18)m * 12 = (12 + 60)m * x

x = 21 days


12) Answer: E

A = 1/32

B = 1/18 – 1/32

B = 7/288

12 * 7 /288 + x/32 = 1

x/32 = 17/24

x = 68/3 = 22(2/3) days


13) Answer: A

Total work = 20 * 26 = 520

Total work done by 40 boys in 7 days = 40 * 7 = 280

x = (520 – 280)/32 = 7.5 days


14) Answer: C

Bala and Rahul’s one day work = 1/9

Bala’s one day work = 1/12

Rahul’s one day work = 1/9 – 1/12 = (12-9)/108 = 3/108 = 1/36

Ratio of efficiency of Rahul to Vinay = 1/36 : 1/45 = 45:36 = 5:4


15) Answer: D

A = 1/36

B = 36 * 7/6 = 42 days

12/36 + (12 + x)/42 = 1

(x + 12) = 28

x = 16 days


16) Answer: E

1/(x + 8) + 1/(x – 2) = 1/(x – 10)

((x – 2) + (x + 8)) * (x – 10) = (x – 2) * (x + 8)

2x2 + 6x – 20x – 60 = x2 + 8x – 2x – 16

x2 – 20x – 44 = 0

x2 – 22x + 2x – 44 = 0

x(x – 22) + 2(x – 22) = 0

x = 22(Neglecting negative number of days)


17) Answer: C

A = 1/24

B + C = 1/16

A + C = 1/12

C = 1/12 – 1/24 = 1/24

B = 1/16 – 1/24

= 1/48


18) Answer: C

A = 1/24

B = 1/40

LCM of 24 and 40 = 120

Work done by A alone in a day = 120/24 = 5 units

Work done by B alone in a day = 120/40 = 3 units

Work done by A and B in one day = 8 * 75/100 = 6 units

Required time = 120/6 = 20 days


19) Answer: C

1/x + 1/(x – 10) = 1/12

((x – 10) + x)/x * (x – 10) = 1/12

(2x – 10) * 12 = x2 – 10x

24x – 120 = x2 – 10x

x2 – 34x + 120 = 0

x2 – 30x – 4x + 120 = 0

x(x – 30) – 4(x – 30) = 0

x = 4, 30 (4 is not possible)


20) Answer: C

A + B + C = 3/20

A = 100/60 * 9 = 15 days

B = 100/80 * 16 = 20 days

C = 3/20 – 1/15 – 1/20

= (9 – 4 – 3)/60 = 1/30

C alone complete 20% of the work = 20/100 * 30 = 6 days

 

Start Quiz

 

21) Aliya, Bala and Sara together can complete the work in 20 days and Aliya alone completes 80% of the work in 36 days. If Bala alone completes 75% of the work in 45 days, in how many days Sara alone completes 80% of the work?

A.74 days

B.75 days

C.76 days

D.72 days

E.None of these


22)
Ratio of the efficiency of A and B is 3:2 and the ratio of the efficiency of A and C is 3:1. If B and C together can complete the work in 12 days, in how many days A and B together can complete the work?

A.4(1/5) days

B.5(1/5) days

C.6(1/5) days

D.7(1/5) days

E.8(1/5) days


23) The efficiency of B is 12.5% less than the efficiency of A. B alone can complete half of the work in 12 days. If A and B together  started  the work and after x days A left the work and B alone completed the remaining work in 9 days, then find the value of x.

A.7

B.9

C.6

D.8

E.None of these


24) A and B together can complete 45% of the work in 10 days and C alone can complete 80% of the work in 24 days. If C and B together can complete 16% of the work in 3 days, in how many days A and C together can complete 70% of the work?

A.12 days

B.15 days

C.16 days

D.8 days

E.10 days


25) A can complete 80% of the work in 12 days and B can complete 60% of the work in 7.2 days. If A and B started the work and after 3 days they left the work and C alone completed the remaining work in 33 days, then in how many days C alone completes the whole work?

A.40 days

B.60 days

C.80 days

D.50 days

E.None of these


26) A can complete the work in 36 days which is 12 days less than the time taken by B to complete the same work and the ratio of the efficiency of B and C is 5:4. In how many days A, B and C together can complete the work?

A.14(15/47) days

B.12(15/47) days

C.18(15/47) days

D.16(15/47) days

E.15(15/47) days


27) A alone completes the work in 18 days and B alone completes the work in 20 days. If B started the work and after 10 days left the work, then A and C together can complete the remaining work in 6 days, in how many days C alone completes the whole work?

A.32 days

B.30 days

C.36 days

D.38 days

E.27 days


28) 15 men can do a work in 8 days, while 12 women can do the same work in 16 days. In how many days 10 men and 8 women together can do the same work?

A.8 days

B.12 days

C.4 days

D.2 days

E.None of these


29) The efficiency of C is 50% more than that of A and 20% more than that of B. Time taken by A and B together to complete the work is 12 days.  Find the number of days taken by all of them together to complete the same work?

A.7(1/5) days

B.7(2/5) days

C.6(1/5) days

D.7(3/5) days

E.None of these


30) If 18 men and 24 women do a piece of work in 9 days and 9 men and 27 women do the same piece of work in 12 days, how long will 6 men and 10 women take to complete the same work?

A.24(6/11) days

B.25(6/11) days

C.26(6/11) days

D.21(6/11) days

E.22(6/11) days

 

Try Time and Work Questions For Online Mock Test

 


Answers :

21) Answer: D

A + B + S = 1/20

A = 100/80 * 36 = 45 days

B = 100/75 * 45 = 60 days

S = 1/20 – 1/45 – 1/60

= (9 – 4 – 3)/180 = 1/90

Sara alone completes 80% of the work = 80/100 * 90 = 72 days


22) Answer: D

Efficiency of A and B = 3:2

Efficiency of A and C = 3:1

Efficiency of A, B and C = 3:2:1

Time ratio of A, B and C = 2:3:6

1/3x + 1/6x = 1/12

3/6x = 1/12

x = 6

A alone completes the work = 2 * 6 = 12 days

B alone complete the work = 3 * 6 = 18 days

A + B = 1/12 + 1/18

= 5/36

Required time = 7(1/5) days


23) Answer: A

B alone can complete the whole work in = 12 * 2/1 = 24 days

A alone can complete the whole work in = 87.5/100 * 24 = 21 days

x/21 + (x + 9)/24 = 1

8x + 7x + 63 = 168

15x = 105

x = 7


24) Answer: A

C alone complete whole work = 100/80 * 24 = 30 days

A + B complete the whole work = 10 * 100/45 = 200/9

C and B together complete the whole work = 3 * 100/16 = 150/8

B alone complete the work = 8/150 – 1/30 = 1/50

A alone complete the work = 9/200 – 1/50 = 1/40

A and C together can complete whole work =1/40 + 1/30 = 7/120

Required answer = 120/7 * 70/100 = 12 days


25) Answer: B

A = 100/80 * 12 = 15 days

B = 100/60 * 7.2 = 12 days

A and B together complete (3/15 + 3/12) part of work in 3 days

Remaining work = 1 – 9/20 = 11/20

C alone complete the whole work = 33 * 20/11 = 60 days


26) Answer: E

A = 36 days

B = 36 + 12 = 48 days

C = 5/4 * 48 = 60 days

A + B + C = 1/36 + 1/48 + 1/60

= (20 + 15 + 12)/720

= 47/720

Required time = 15(15/47) days


27) Answer: C

A = 1/18

B = 1/20

B completes 10/20 of work in 10 days

Remaining work = 1 – 1/2 = 1/2

A and C together can complete the 1/2 of the work in 6 days

A and C together can complete whole work in 12 days

C = 1/12 – 1/18 = 1/36


28) Answer: A     

15 men’s one day work = 1/8

Therefore 1 man’s one day work= 1/(8*15)

12 women’s one day work = 1/16

Therefore 1 woman’s one day work= 1/(12*16)

Required time = 10 men + 8 women = [10/(8*15)] + [8/(12*16)] = (1/12)+(1/24) = (2+1)/24 = 3/24 = 1/8

10men and 8 women together can complete a work in 8 days


29) Answer: A     

Efficiency ratio of C to A = 150: 100 = 3: 2

Efficiency ratio of C to B = 120: 100 = 6:5

Efficiency ratio of A : B : C = 4 : 5: 6

Total work = (A+B)*12 = (4+5)*12 = 108 unit

Total number of days taken = 108/(4+5+6) = 108/15= 7(1/5)days


30) Answer: A

(18m + 24w) * 9 = (9m + 27w) * 12

54m + 72w = 36m + 108w

36w = 18m

m = 2w

(18 + 12)m = 1/9

m = 1/270

6m + 10w = 6m + 5m

Required time = 11/270

= 24(6/11) days

 

Start Quiz

 

31) Anu, Babu and Saran can complete the homework given by their class teacher in 6, 12 and 18 days respectively. In how many days will they together complete the same homework?

A.3 3/11 days

B.4 1/5 days

C.5 1/6 days

D.8 1/4 days

E.None of these


32) The ratio of time taken by A and C to do a work is 3:4 respectively. B takes 50% more time than C. 20% of the work is completed by C in 4 days. Find the time taken by A and B together to complete the whole work?

A.10 days

B.20 days

C.45 days

D.30 days

E.None of these


33) A and B together can complete three-fourth of the work in 27 days. If the efficiency of A is 200% more than that of B, in how many days B alone complete four-fifth of the work?

A.115.2 days

B.118.4 days

C.120.5 days

D.122.4 days

E.120.5 days


34) A alone can do a work in 18 days and B can do 60% of the same work in 12 days. If B alone started the work and left after 5 days and then A alone completes the remaining, then in how many days the whole work will be completed?

A.15.5 days

B.18.5 days

C.16.2 days

D.14.5 days

E.25.5 days


35) A alone complete the work in x days and B alone complete the same work in (x + 2) days and the efficiency of B is 25% less than that of C. If A, B and C together can complete 75% of the work in 1(7/11) days, then find the value of x?

A.4

B.3

C.6

D.5

E.7


36) A completes one-third of the work in 20 days and B completes half of the work in 15 days. In how many days A and B together can complete the work?

A.10 days

B.15 days

C.18 days

D.20 days

E.None of these


37) A and B can complete the work in 20 days and 30 days respectively  and after 5 days C joined with them. C is twice the efficiency of B. In how many days total work is completed?

A.5(8/9) days

B.6(8/9) days

C.7(8/9) days

D.8(8/9) days

E.None of these


38) A and B together can complete a work in 20 days and B alone complete the work in 30 days. If already 25% of the work is completed, then how many days A alone complete the remaining work?

A.40 days

B.45 days

C.50 days

D.48 days

E.None of these


39) A, B and C together can complete the work in 6(2/3) days and A alone complete 60% of the work in 9 days. If B alone complete 80% of the work in 16 days, in how many days C alone complete 20% of the work?

A.4 days

B.5 days

C.6 days

D.7 days

E.None of these


40) A can do a piece of work in 20 days, B can do the same work in 15 days and C can do it in 40 days. A alone worked for 5 days and handed over to B, who worked for 3 days and left the job. In how many days will C take to finish the remaining work?

A.16 days

B.22 days

C.24 days

D.20 days

E.None of these

 

Try Time and Work Questions For Online Mock Test

 

 

Answers :

31) Answer: A

Anu, Babu and Saran can do the work in = xyz/(xy + yz + zx)

= (6 * 12 * 18)/(6 * 12 + 12 * 18 + 18 * 6)

= 36/11 = 3 3/11 days


32) Answer: A     

The time ratio A : C = 3 : 4

B = 150/100 * 4x = 6x

Time ratio A : C : B = 3 : 4 : 6

For C:

20% work will be completed in 4 days

100% of work will be completed in 4*5=20 days

4x = 20 days

x= 5

Required answer =1/15 + 1/30 = 1/10 =10 days


33) Answer: A

Efficiency of A and B = 300:100 = 3:1

A and B together can complete the whole work = 4/3 * 27 = 36 days

Time ratio of A and B = 1:3

1/x + 1/3x = 1/36

4/3x = 1/36

x = 48

B alone complete four-fifth of the work = 4/5 * 48 * 3

= 115.2 days


34) Answer: B

A = 1/18

B = 100/60 * 12 = 20 days

B alone complete 5/20 of work in 5 days.

Remaining work = 1 – 1/4 = 3/4

A alone complete 3/4 of work = 18 * 3/4 = 13.5 days

Required time = 5 + 13.5 = 18.5 days


35) Answer: C

A = 1/x

B = 1/(x + 2)

C = 1/(x+2) * 100/75 = 4/3(x+2)

Time taken to complete the whole work by A, B and C together= 100/75 * (18/11) = 24/11

1/x + 1/(x + 2) + 4/3(x + 2) = 11/24

(3x + 6 + 3x + 4x)/(3x * (x + 2)) = 11/24

240x + 144 = 33x2 + 66x

11x2 – 58x – 48 = 0

x = 6 (neglecting negative values)


36) Answer: D

A completes the full work in = 3/1 * 20 = 60 days

B completes the full work in = 2 * 15 = 30 days

A + B = 1/60 + 1/30 = 3/60

= 1/20

A and B can complete the work in 20 days.


37) Answer: D

A = 1/20

B = 1/30

C = 1/15

LCM of (20, 30, 15) = 60 units

A complete the one day work = 3 units

B complete the work in one day = 2 units

C complete the work in one day = 4 units

A and B works in first five days = 5 * (3 + 2) = 25 units

Remaining work = 60 – 25 = 35

A, B and C together can complete the remaining work in = 35/(3 + 2 + 4)

= 35/9 = 3(8/9) days

Total work time = 5 + 3 (8/9) = 8(8/9) days


38) Answer: B

(A + B)’s one day work = 1/20

B’s one day work = 1/30

A’s one day work = 1/20 – 1/30

= (3 – 2)/60 = 1/60

A complete the whole work in 60 days.

A completes the 75% of the work in (60 * 75/100) = 45 days


39) Answer: C

A + B + C = 3/20

A = 100/60 * 9 = 15 days

B = 100/80 * 16 = 20 days

C = 3/20 – 1/15 – 1/20

= (9 – 4 – 3)/60 = 1/30

C alone complete 20% of the work = 20/100 * 30 = 6 days


40) Answer: B

A’s 1 day work = 1/20

A’s 5 days work = 5/20 = 1/4

B’s 1 day work = 1/15

B’s 3 day work = 3/15 = 1/5

Remaining work = 1 – (1/4 + 1/5) = 11/20

C can take to finish the work in,

(11/20) * 40 = 22 days

 

Start Quiz

 

41) A alone completes a work in 12 days and B alone completes the same work in 24 days. If A, B and C started the work alternatively, starting from A, next B and then C so on, after 9 days A and B left the work, then C alone completes the work in 27 days. In how many days C alone complete the whole work?

A.30 days

B.36 days

C.45 days

D.48 days

E.42 days


42) A alone completes a work in 80 days, B alone completes the same work in 64 days and C alone completes the work in 160 days. If A, B and C together can started the work, after 20 days A left from the work and B left from the work 15 days before completion of the work, in how many days the whole work is completed?

A.36 days

B.45 days

C.27 days

D.48 days

E.32 days


43) A alone completes a work in 15 days and B alone completes the work in 30 days. If A started the work and after 6 days B joined, in how many days the whole work completed?

A.10 days

B.8 days

C.12 days

D.15 days

E.18 days


44) A can do a piece of the work in 20 days and B can do the piece of the work in 30 days. A and B together started the work and B left the work in 5 days before completion of the work. In how many days the total work is completed?

A.12 days

B.14 days

C.16 days

D.18 days

E.None of these


45) Ani can complete a work in 12 days working 5 hours a day, Anu can complete the same work in 25 days working 3 hours a day, Anish can destroy the same work in 15 days working 6 hours a day, find the total time taken by them (in hours) to complete/destroy the same work together.

A.52  15/17  hours

B.52  14/17  hours

C.52  16/19  hours

D.52  16/17  hours

E.None of these


46) A can do a piece of work in 30 days and A and B together can complete the work in 18 days. If A, B and C together can complete the work in 15 days and they are gets the total wages is 1380, then what is the wage of B?

A.Rs.520

B.Rs.480

C.Rs.500

D.Rs.460

E.None of these


47) 24 men were appointed to complete the work in 40 days. But after 20 days, it was found that only one third of the work only completed. In how many extra men needed to be complete the work in time?

A.20

B.22

C.24

D.28

E.None of these


48) A, B and C can do a piece of work in 8, 12, and 24 days respectively. They all begin to work together. C left the work after 2 days and B left 3 days before its completion, whereas A continues to work till it is finished. In what time is the work finished?

A.5 3/5  days

B.3 1/2  days

C.3 4/7  days

D.4 5/6  days

E.4 3/5  days


49) A and B together can complete a work in 20 days and B alone complete the work in 30 days. If already 25% of the work is completed, then how many days A alone complete the remaining work?

A.40 days

B.45 days

C.50 days

D.48 days

E.None of these


50) Raina and Kholi can complete a work in 32days and 36days respectively. Both worked together for 12days and after that Kholi is replaced by Dhoni and worked for 3 days and then Dhoni left. Remaining work is done by Raina in next day, then find the time taken by Dhoni to complete the work alone.

A.20 days

B.24 days

C.16 days

D.18 days

E.27 days

 

Try Time and Work Questions For Online Mock Test

 

 

Answers :

41) Answer: D

A, B and C together can complete the work in 9 days = 3/12 + 3/24 + 3/C

= ¼ + 1/8 + 3/C

= 3/8 + 3/C

Remaining work = 1- 3/8 – 3/C = 5/8 – 3/C

5/8 – 3/C = 27/C

30/C = 5/8

C = 48 days


42) Answer: B

20/80 + (x – 15)/64 + x/160 = 1

80 + 5x – 75 + 2x = 320

7x = 315

x = 45 days


43) Answer: C

x/15 + (x – 6)/30 = 1

2x + x – 6 = 30

3x = 36

x = 12 days


44) Answer: B

Work done by A in one day,

A = 1/20

Work done by B in one day,

B = 1/30

Work done by A and B,

x/20 + (x – 5)/30 = 1

3x + 2x – 10 = 60

5x = 70

x = 14 days


45) Answer: D

Ani worked 60 hours to complete the work alone

Anu worked 75 hours to complete the work alone

Anish worked 90 hours to destroy the work alone

Work done by them per hour,

= (1/60) + (1/75) – (1/90)

= (15+12-10)/900

= 17/900

Total work is done in 900/17 i.e 52   16/17  hours


46) Answer: D

LCM of 30, 18 and 15 = 180

Total work = 180 units

A’s per day work = 180/30 = 6 units

(A+B)’s per day work = 180/18 = 10 units

(A+B+C)’s per day work = 180/15 = 12 units

B’s per day work = 10 – 6 = 4 units

C’s per day work = 12 – 10 = 2 units

Efficiency ratio of A, B and C = 6: 4: 2 = 3: 2: 1

B’s wage = 2/6 * 1380 = Rs.460


47) Answer: C

(Men1 * day 1)/ work 1 = (Men2 * day 2) / work2

(24 * 20)/(1/3)=(24 + x) * 20/(2/3)

48=24 + x

x =24


48) Answer: A

Shortcut:

LCM of 8, 12 and 24 = 24 units

A = 3 units per day

B = 2 units per day = > B’s 3 days work = 6 units

C = 1 unit per day = > C’s 2 days work = 2 units

Required number of days = (24 – 2 + 6)/5

= 28/5 = 5  3/5 days


49) Answer: B

(A + B)’s one day work = 1/20

B’s one day work = 1/30

A’s one day work = 1/20 – 1/30

= (3 – 2)/60 = 1/60

A complete the whole work in 60 days.

A completes the 75% of the work in (60 * 75/100) = 45 days


50) Answer: D

In total,

Raina worked for 12+3+1 =16 days

Kholi worked for 12 days

Dhoni worked for 3 days

Let, time taken by Dhoni to complete the work alone =x

Work done by them,

16/32 + 12/36 + 3/x=1

3/x=1-1/2-1/3

3/x=1/6

x=18 days

Time taken by Dhoni to complete the work alone =18 days

 

Download Time and Work Questions for SBI/ IBPS PO Prelims Exam PDF

For More Time and Work Questions PDF

Try IBPS PO Free Online Mock Test

Try SBI PO Free Online Mock Test

0 0 votes
Rating
Subscribe
Notify of
guest
2 Comments
Inline Feedbacks
View all comments